The math behind a chiller rating is simple once you have the right inputs - the hard part is getting the heat load number right in the first place.
Working the calculation by hand takes three inputs: heat load in BTU/hr (convert tons to BTU/hr by multiplying by 12,000), your target flow rate in GPM, and the delta-T between supply and return fluid temperature. Divide heat load by (GPM x 500 x the glycol mix's specific heat factor) to solve for delta-T, or rearrange the same formula to solve for GPM if delta-T is fixed by the process.
A worked example: a fermentation load of 60,000 BTU/hr, running a 25% propylene glycol mix (specific heat factor roughly 0.95) at a 10°F delta-T, needs about 12.6 GPM - (60,000) / (10 x 500 x 0.95). That GPM and delta-T then set the target tonnage: 60,000 BTU/hr is 5 tons, so the chiller needs to be rated for 5 tons at whatever leaving fluid temperature the fermentation actually requires.
If you'd rather skip the math, send us the heat load (or the equipment specs that let us calculate it), your target fluid temperature, and indoor-vs-outdoor installation - we'll work the sizing and come back with a rating rather than asking you to run the numbers yourself.
Get the heat load from equipment data, not a guess
Set delta-T or GPM and the other one falls out
Use roughly 0.91 to 0.96 for 20-40% propylene, not the 1.0 factor for water
Convert the load to tons and confirm the loop GPM
The formula behind every rating is BTU/hr = GPM × delta-T × 500 × specific heat factor. Solve it for whichever variable your process fixes and the others fall out - a fixed delta-T tells you the GPM you need, a fixed GPM (say, from an existing pump) tells you the delta-T you'll get.
The specific heat factor is what most hand calculations get wrong: water is 1.0, but a propylene glycol solution runs from about 0.96 at 20% down to about 0.91 at 40%, so plugging in 1.0 for a glycol loop understates the flow you actually need by roughly 4-10%.
| Scenario | Heat Load | Delta-T | Glycol Mix | Approx. GPM | Tons Needed |
|---|---|---|---|---|---|
| Fermenter jacket cooling | 60,000 BTU/hr | 10°F | 25% propylene | ~12.6 GPM | 5 tons |
| Compressor jacket cooling | 120,000 BTU/hr | 15°F | 30% propylene | ~17 GPM | 10 tons |
| Plastics mold cooling | 300,000 BTU/hr | 8°F | 20% propylene | ~78 GPM | 25 tons |
These are worked examples to show the math, not a lookup table for your own job - actual GPM and tonnage depend on your specific numbers.
Call and talk it through with an engineer: 1-805-484-2992.