1-805-484-2992

Quotes - Sizing - Sales
Replacement unit for the PRO Refrigeration Revolution Series

Revolution Series

PRO's legacy Revolution chillers: two screw compressors, 160 to 220 hp, four pumps and a 2,000-gallon tank.

PRODUCT TYPE CAPACITY MODELS
Glycol Chiller Screw, Legacy 160 to 220 HP 3

Specifications


Configuration & Size

Capacity:
1,192,999 to 1,762,000 Btu/h at 30°F
Models:
3 part numbers
Compressors:
2 x 80 to 2 x 110 hp
Pumps:
4 per unit
Tank:
2,000 gallons

Construction

  • Two screw compressors
  • 2 x 10 hp circulation pumps
  • 2 x 15 hp process pumps
  • 4-inch flanged process connections
  • Coated steel, galvanized housing

Ratings

  • Rated at 20 to 35°F glycol
  • 90°F ambient
  • Refrigerant not listed
  • 460 V three-phase

Specifications sourced from PRO Refrigeration's published chiller data sheets, series one-sheets and legacy specification tables (prochiller.com), October 2026. PRO Refrigeration, PRO Chiller Systems, Chill&Flow, ChilStar, PRO4, V Piston, V-Scroll, Revolution, PROGreen and PROElliot are trademarks of their owner; referenced here for cross-reference only. PRO publishes these as estimated capacities. Confirm against the unit nameplate before ordering.

Revolution Series, 160 to 220 HP

Four Pumps, Two Screws

Three models. The PB280B130R42000-A-VD, PB290B167R42000-A-VD and PB2110B167R42000-A-VD, two compressors of 80, 90 and 110 hp.

Capacity at the glycol temperature. From 1,192,999 Btu/h at 30°F to 1,762,000 Btu/h, at 90°F ambient.

Four pumps. Two 10 hp circulation pumps and two 15 hp process pumps, with 4-inch flanged process connections.

Big frames. 381 to 428 inches long, 41,000 to 46,000 lbs operating, on 460 V three-phase.



a spray ball cleaning the inside of a stainless tank

Two screw compressors, four pumps and a 2,000-gallon tank on a 381 to 428-inch frame.

Request a Quote

Revolution Series Applications

Brewery fermentation
Brewery fermentation
Dairy plants
Dairy plants
Cold storage
Cold storage
Plant glycol
Plant glycol

schematic of the Revolution series circuit, showing where the process fluid and the condenser heat go

Most of These Leave Temptek's Range

Divided by 0.60, two of the three Revolution figures are beyond any single Temptek unit, and their pages point to the add-on module range on our sister site.

Every part-number page below names the Temptek unit we supply in its place, sized from PRO's 30°F figure on Temptek's published multiplier: a Temptek unit makes 0.60 of its 50°F rating at a 30°F set point, so the pick is the PRO figure divided by 0.60.
Call and talk it through with an engineer: 1-805-484-2992

What Engineers Ask About the PRO Revolution

With add-on chiller modules combined to the load, because the 220 hp PB2110B167R42000-A-VD needs more than any one packaged Temptek unit carries. PRO lists it at 1,762,000 Btu/h at 30°F, 146.83 tons, which divided by 0.60 is 244.72 tons of 50°F rating; the 180 hp PB290B167R42000-A-VD needs 193.62. The module range builds plant-wide systems to 300 tons, so both fit with room for a later step. What modules do not replace by themselves is the Revolution's 2,000-gallon tank and its four pumps, all built into PRO's frame. Those are specified alongside the modules, and the module count can be split so that losing one leaves most of the plant running.

Two 15 hp process pumps can run together for flow, hold one in standby, or each feed its own loop, and the replacement has to know which. PRO's legacy table lists the two process pumps, the two 10 hp circulation pumps and the 4-inch flanged process connections, but not how they are sequenced, so that answer comes from the site. Check the controls, or ask whoever runs the cellar, whether both process pumps run at peak. If they do, the new pumping has to deliver the combined flow; if one is a spare, the plant probably wants a spare again; if each serves its own loop, both duties are specified. Getting this wrong shows up as a loop that cannot reach the far tanks, or as a plant that lost its backup without noticing.

A heavy lift and a large feeder: the 160 and 180 hp units are 381 x 102 x 124 inches at 41,000 lbs operating, and the 220 hp stretches to 428 inches at 46,000 lbs. MCA at 460 V three-phase is 432, 473 and 513 A across the three models. Draining the 2,000-gallon tank first takes a large share of that operating weight off the lift, and the glycol charge has to go somewhere, so plan its storage or disposal. PRO's legacy table lists no refrigerant, so read it from the nameplate early; recovery has to be booked before the crane. The replacement's own feeder requirement is checked against the existing 460 V service, not assumed.

About 165.7 tons of 50°F rating, which the TTOACS-190D-MZC-2P covers at 170.1 tons. PRO lists the PB280B130R42000-A-VD at 1,192,999 Btu/h, or 99.42 tons, on its 30°F, 90°F-ambient column. Worked back to 30°F, the 190D makes about 102 tons, roughly 2.6 tons more then the Revolution, which is enough for a straight swap and not much more. It is the only Revolution that stays on one packaged unit, so a plant planning to add tanks should say so before ordering, since the headroom over today's load is small.

Quote Request Form:

Questions?

1-805-484-2992

Quotes - Sizing - Sales