1-805-484-2992

Quotes - Sizing - Sales
Replacement unit for the PRO Refrigeration V Piston Series

V Piston Series

PRO's large chillers: V Piston units on Bitzer semi-hermetic compressors, from a 200-gallon tank to 2,000 gallons and 2,586,000 Btu/h at 35°F.

PRODUCT TYPE CAPACITY MODELS
Glycol Chiller Packaged, Semi-Hermetic Up to 2,586,000 Btu/h 19

Specifications


Configuration & Size

Capacity:
171,200 to 2,298,000 Btu/h at 30°F
Models:
19 part numbers
Compressors:
10 to 50 hp
Pumps:
2 to 7.5 hp each
Tank:
200 to 2,000 gallons

Construction

  • Bitzer semi-hermetic compressors
  • V-coil microchannel condenser
  • Brazed plate evaporator, EEV
  • Dual stainless pumps
  • Touchscreen, web monitoring

Ratings

  • Rated at 20 to 35°F glycol
  • 90°F and 100°F ambient
  • R448A / R449A
  • 230 or 460 V three-phase

Specifications sourced from PRO Refrigeration's published chiller data sheets, series one-sheets and legacy specification tables (prochiller.com), October 2026. PRO Refrigeration, PRO Chiller Systems, Chill&Flow, ChilStar, PRO4, V Piston, V-Scroll, Revolution, PROGreen and PROElliot are trademarks of their owner; referenced here for cross-reference only. PRO publishes these as estimated capacities. Confirm against the unit nameplate before ordering.

V Piston Series, Up to 300 HP

Bitzer Compressors, Big Tanks

Nineteen models. From the PB210B98R8200-V-V on a 200-gallon tank to the PB650B146R82000-V-V on 2,000 gallons, with 550 and 1,000-gallon frames between.

Capacity at the glycol temperature. From 171,200 Btu/h at 30°F on the PB210 to 2,298,000 Btu/h on the PB650, at 90°F ambient; PRO lists the PB225 sheet with no capacity.

The build is heavier. Bitzer semi-hermetic compressors, a V-coil microchannel condenser with speed-controlled external-rotor fans, a brazed plate evaporator on electronic expansion valves, and dual stainless pumps.

Controls are remote. A TCC microprocessor controller with a touchscreen and web-based monitoring and alarms as standard.



refrigerant cylinders lined up in a plant

Semi-hermetic compressors, a V-coil condenser, brazed plate evaporator, dual pumps and a large insulated tank.

Request a Quote

V Piston Series Applications

Brewery fermentation
Brewery fermentation
Dairy plants
Dairy plants
Cold storage
Cold storage
Plant glycol
Plant glycol

schematic of the V Piston series circuit, showing where the process fluid and the condenser heat go

The Largest Units Leave Temptek's Range

Divided by 0.60, the biggest V Piston figures call for more than any single Temptek unit makes, and those pages point to the add-on module range on our sister site, paired to the load. One data sheet, the PB430B78R81000, prints 86,000 Btu/h at 30°F against 972,000 at 35°F; its page uses the 35°F figure and says so.

Every part-number page below names the Temptek unit we supply in its place, sized from PRO's 30°F figure on Temptek's published multiplier: a Temptek unit makes 0.60 of its 50°F rating at a 30°F set point, so the pick is the PRO figure divided by 0.60.
Call and talk it through with an engineer: 1-805-484-2992

PRO V Piston: Sizing a Replacement by Frame

Only a few minutes' worth: on a water basis, each tank holds roughly two to three minutes of its unit's full output for every 5°F the glycol is allowed to rise. The 500 in the water formula is 60 minutes times about 8.33 Btu per gallon per °F. The 2,000-gallon tank on the PB650B146R82000-V-V therefore stores about 16,700 Btu per °F, so a 5°F rise absorbs some 83,000 Btu, while the 2,298,000 Btu/h PRO lists at 30°F is about 38,300 Btu a minute: a little over two minutes. The 200-gallon PB210B98R8200-V-V comes out near three minutes. Glycol stores somewhat less than water, so the real figures are shorter. The tank steadies compressor staging and rides out a valve opening; it does not carry a crash. The mistake is counting a big tank as stored cooling and trimming the replacement's tons, or dropping the tank and getting a unit that short-cycles. Tell us the volume your frame carries.

About 8 tons at 30°F glycol, enough for a like-for-like swap but not for much growth. PRO lists the PB440B114R81000-V-V at 104.67 tons at 30°F, which needs 174.45 tons on Temptek's 50°F basis; the TTOACS-210D-MZC-2P at 188 tons works back to about 112.8 tons at 30°F. Above it, the PB650B146R82000-V-V, at 191.5 tons, needs 319.17 tons, beyond any one unit, so it moves to add-on modules paired to the load. Treat a PB440 as the boundary case: if more tanks are coming, a module system may serve better over the long term than the largest single packaged chiller.

From the load it actually carries, measured on site, since there is no published figure to divide. On a running loop, flow and temperature spread give the duty directly: for water, Btu/h equals 500 x GPM x the spread in °F, so, for example, 100 GPM across 6°F is 300,000 Btu/h, or 25 tons. Because a glycol mix holds somewhat less heat than water, that formula reads a little high, and we correct it for the mix. Take the readings on a hot afternoon with the cellar at its busiest, not on a quiet morning. Add the nameplate data and the set point, and we work the pick from there.

They leave with the PRO unit, so list what the plant relies on before the swap. Each V Piston's TCC controller gives touchscreen control plus remote alerts over the web, and many cellars have built their overnight coverage around those alerts. The Temptek unit we supply is matched on 30°F capacity, not on controls, so remote access, alarm points and any link to a building system are specified on the quote. Write down which alarms reach whom, by what route, and how the set point is changed today. The failure to avoid is a new chiller that runs well and a high-temperature alarm nobody receives on a Saturday night.

The PB230 goes to the TTOACS-80D-MZC-2P and the PB250 to the TTOACS-120D-MZC-2P, and the two picks leave very different reserve. The PB230B78R8550-V-V is published at 430,000 Btu/h, 35.83 tons, at 30°F and 90°F ambient, so it needs 59.72 tons of 50°F rating against the 80D's 75.8; at 30°F that is roughly 9.6 tons of spare capacity. The PB250B146R8550-V-V, at 63.83 tons, needs 106.38 tons, and the 120D carries 110.1, about 2.2 tons spare at 30°F. Both margins are figured on PRO's 90°F-ambient column; the sheets also print a 100°F column, and on a hot site that is the one to read, since the PB250's thinner margin is the first to go.

Quote Request Form:

Questions?

1-805-484-2992

Quotes - Sizing - Sales